01
Residential
Footings, roof slabs and staircases in M20–M25 across Amritsar, Majitha and Batala.
Rate Calculator
Watch the quick walkthrough to see how it works, then open the calculator to build a ready-mix rate per cubic metre — material, transport, production and GST — and share it as a PDF or on WhatsApp.
Eight plants and supply bases keep concrete workable across the Majha belt, Doaba, Malwa and the Jammu highway — because plant-to-site distance is the single biggest factor in a pour arriving right.
Design-mix grades from M10 through to M50
Round-the-clock batching, Monday to Sunday
Batched to IS 456 with full challan traceability
From a single house slab to sustained supply on commercial and infrastructure sites — the batching discipline is identical.
Design-mix ready mix concrete M10 to M50 for footings, slabs, beams, columns and walls — proportioned to IS 10262.
View → Series 02Steel and polypropylene fibre dosed to control shrinkage cracking in floors, ramps and thin sections.
View → Series 03Flows into congested reinforcement with no vibration — ideal for heavily reinforced columns and walls.
View → Series 04Cohesive mixes for boom and line pumping, and pavement quality concrete for roads and yards.
View → Series 05Polished, stamped, coloured and stained concrete cast in place where the surface stays on show.
View →
We do not run a trading desk. We own the plants, run the mixers and stand at the discharge point — so we can tell you honestly whether a pour will work, and refuse a load rather than send one that arrives unworkable.
How we control quality→
Characteristic 28-day strength and typical use. Your structural consultant's specification always takes precedence.
| Grade | 28-day strength | Typical application | Class | |
|---|---|---|---|---|
| M10 | 10 N/mm² | PCC, levelling course, bedding under footings | Non-structural | Quote |
| M15 | 15 N/mm² | Plain cement concrete, flooring base, kerbs | Non-structural | Quote |
| M20 | 20 N/mm² | Residential slabs, columns, beams, boundary walls | Structural | Quote |
| M25 | 25 N/mm² | RCC slabs, footings, framed houses and shops | Structural | Quote |
| M30 | 30 N/mm² | Multi-storey RCC, water-retaining members, ramps | Structural | Quote |
| M35 | 35 N/mm² | Commercial towers, industrial floors, precast | High strength | Quote |
| M40 | 40 N/mm² | Bridges, heavy columns, transfer girders | High strength | Quote |
| M45 | 45 N/mm² | Infrastructure, precast and prestressed elements | High performance | Quote |
| M50 | 50 N/mm² | Runways, marine and prestressed structures | High performance | Quote |
Plants and supply bases across the Majha belt, Doaba–Malwa corridor and the Jammu highway — so the mixer reaches you while the mix is still right.
Work out volume, transit-mixer loads, cement bags, material tonnage and budget before you call. Each builds a WhatsApp-ready enquiry with the exact numbers.
Kathua, Samba, Vijaypur
Punjab & Jammu
Pathankot, Gurdaspur belt
Give us the grade, the volume and the pour date. We confirm from the nearest Kapsha plant.